Operations & lean manufacturing · More output from the same plant, people and working capital.
A plant that runs at full overtime and still misses dispatch dates usually has a flow problem, not a capacity problem. Machines wait for material, material waits for approvals, and finished goods wait for paperwork.
We walk the floor with your supervisors, measure where time and stock are lost, and fix the few constraints that matter. The changes are small, visible and owned by your own team.
What the work covers
OEE, changeover, rejection and stock at each stage, measured on the floor over real shifts.
Line balancing, material movement and storage redesigned around the products that pay the bills.
Reorder levels, production planning and supplier lead times set so cash is not locked in stock.
Simple boards, shift meetings and problem-solving routines that keep the gains after we leave.
Questions people ask
Do you work in small plants?
Yes. Owner-run plants often gain the most, because a few changes in flow and planning show up quickly in cash and dispatches.
Will this need new machines?
Rarely at the start. We first take out waiting, rework and excess stock with the equipment you already have.
Start with a conversation
A short note on the problem is enough. We call back within one working day.
Other practices
Tell us the problem or the role.
Call or WhatsApp +91 98290 28498 · hi@ebidtaconsulting.com